* Habits not showing in agenda and no progress graph @ 2011-07-26 21:22 John Hendy 2011-07-27 5:32 ` Michael Brand 0 siblings, 1 reply; 6+ messages in thread From: John Hendy @ 2011-07-26 21:22 UTC (permalink / raw) To: emacs-orgmode I'm attempting to implement habits for a couple of routine things I should do at work on a regular basis. I've been following the manual to set this up: ,----- | 1. You have enabled the habits module by customizing the variable org-modules. CHECK | 2. The habit is a TODO item, with a TODO keyword representing an open state. CHECK | 3. The property STYLE is set to the value habit. CHECK | 4. The TODO has a scheduled date, usually with a .+ style repeat interval... CHECK | 5. The TODO may also have minimum and maximum ranges specified by using the syntax ‘.+2d/3d’... CHECK | 6. You must also have state logging for the DONE state enabled... THINK SO `----- I have mid-year and yearly reviews and *always* kick myself for not recording things I've done regularly, such that I end up scouring the earth for details about what I did in emails, calendar items, and org files. I'd like to do this monthly to save me 2x/year headaches. So... enter my first attempt at implementing habits: ----- ** todo note down month's accomplishments/contributions SCHEDULED: <2011-08-20 Sat .+25d/35d> :LOGBOOK: - State "done" from "todo" [2011-07-26 Tue 16:02] - State "done" from "todo" [2011-07-26 Tue 16:02] :END: :PROPERTIES: :STYLE: habit :LAST_REPEAT: [2011-07-26 Tue 16:02] :END: ----- Note that above for #6, I said I thought so. I'm saying that as the todo -> done state appears to be tracked above in my cycling. Typically, I just get a completed inactive time stamp and it gets marked done. The fact that it stays open I'm guessing means the habit is working. But... I have a couple of questions: #1: the habits aren't showing up in agenda. I did =C-c a a=, then =v y= and accepted that I really wanted to see the year. I get no monthly views of the above habit, despite seeing the minibuffer mode as "Org-agenda Year Dds Grid Habit" If I press =K=, it tells me that habits have been turned off, so I know they were on. #2: I just don't understand this at all (from the manual): ,----- | What's really useful about habits is that they are displayed along with a consistency graph, | to show how consistent you've been at getting that task done in the past. This graph shows | every day that the task was done over the past three weeks, with colors for each day. | | Followed by overview of what the colors mean... `----- Where is this graph? I don't see any colors. The worg tutorial doesn't mention the word graph anywhere, and only shows making a table manually to document progress. It also doesn't mention the word color. Thanks for any suggestions. It's my first time, so it's probably that I've missed something silly in my setup or have a typo. Thanks! John ^ permalink raw reply [flat|nested] 6+ messages in thread
* Re: Habits not showing in agenda and no progress graph 2011-07-26 21:22 Habits not showing in agenda and no progress graph John Hendy @ 2011-07-27 5:32 ` Michael Brand 2011-07-27 6:16 ` John Hendy 0 siblings, 1 reply; 6+ messages in thread From: Michael Brand @ 2011-07-27 5:32 UTC (permalink / raw) To: John Hendy; +Cc: emacs-orgmode Hi John - State logging is working ok as seen from the LOGBOOK. - A habit task is simply not shown before the SCHEDULED date. Try this task state to get an impression of the graph (change TODO and DONE keywords to reflect your setup): #+begin_src org ,* TODO note down month's accomplishments/contributions , SCHEDULED: <2011-07-25 Mon .+5d/10d> , :LOGBOOK: , - State "DONE" from "TODO" [2011-07-20 Wed 12:00] , - State "DONE" from "TODO" [2011-07-15 Fri 12:00] , :END: , :PROPERTIES: , :STYLE: habit , :LAST_REPEAT: [2011-07-20 Wed 12:00] , :END: #+end_src - Side note: It seems that like when experimenting you have set the task twice to DONE at the same time which is not useful but does not hurt to get started with habits. On Tue, Jul 26, 2011 at 23:22, John Hendy <jw.hendy@gmail.com> wrote: > I'm attempting to implement habits for a couple of routine things I > should do at work on a regular basis. I've been following the manual > to set this up: > > ,----- > | 1. You have enabled the habits module by customizing the variable > org-modules. CHECK > | 2. The habit is a TODO item, with a TODO keyword representing an > open state. CHECK > | 3. The property STYLE is set to the value habit. CHECK > | 4. The TODO has a scheduled date, usually with a .+ style repeat > interval... CHECK > | 5. The TODO may also have minimum and maximum ranges specified by > using the syntax ‘.+2d/3d’... CHECK > | 6. You must also have state logging for the DONE state enabled... THINK SO > `----- > > I have mid-year and yearly reviews and *always* kick myself for not > recording things I've done regularly, such that I end up scouring the > earth for details about what I did in emails, calendar items, and org > files. I'd like to do this monthly to save me 2x/year headaches. So... > enter my first attempt at implementing habits: > > ----- > ** todo note down month's accomplishments/contributions > SCHEDULED: <2011-08-20 Sat .+25d/35d> > :LOGBOOK: > - State "done" from "todo" [2011-07-26 Tue 16:02] > - State "done" from "todo" [2011-07-26 Tue 16:02] > :END: > :PROPERTIES: > :STYLE: habit > :LAST_REPEAT: [2011-07-26 Tue 16:02] > :END: > ----- > > Note that above for #6, I said I thought so. I'm saying that as the > todo -> done state appears to be tracked above in my cycling. > Typically, I just get a completed inactive time stamp and it gets > marked done. The fact that it stays open I'm guessing means the habit > is working. > > But... I have a couple of questions: > > #1: the habits aren't showing up in agenda. I did =C-c a a=, then =v > y= and accepted that I really wanted to see the year. I get no monthly > views of the above habit, despite seeing the minibuffer mode as > "Org-agenda Year Dds Grid Habit" If I press =K=, it tells me that > habits have been turned off, so I know they were on. > > #2: I just don't understand this at all (from the manual): > > ,----- > | What's really useful about habits is that they are displayed along > with a consistency graph, > | to show how consistent you've been at getting that task done in the > past. This graph shows > | every day that the task was done over the past three weeks, with > colors for each day. > | > | Followed by overview of what the colors mean... > `----- > > Where is this graph? I don't see any colors. The worg tutorial doesn't > mention the word graph anywhere, and only shows making a table > manually to document progress. It also doesn't mention the word color. > > Thanks for any suggestions. It's my first time, so it's probably that > I've missed something silly in my setup or have a typo. > > > Thanks! > John ^ permalink raw reply [flat|nested] 6+ messages in thread
* Re: Habits not showing in agenda and no progress graph 2011-07-27 5:32 ` Michael Brand @ 2011-07-27 6:16 ` John Hendy 2011-07-27 7:23 ` Michael Brand 2011-07-27 14:26 ` Memnon Anon 0 siblings, 2 replies; 6+ messages in thread From: John Hendy @ 2011-07-27 6:16 UTC (permalink / raw) To: Michael Brand; +Cc: emacs-orgmode On Wed, Jul 27, 2011 at 12:32 AM, Michael Brand <michael.ch.brand@gmail.com> wrote: > Hi John > > - State logging is working ok as seen from the LOGBOOK. Good to know. > - A habit task is simply not shown before the SCHEDULED date. Try this > task state to get an impression of the graph (change TODO and DONE > keywords to reflect your setup): Ah. That might have done it. I was playing around a bit tonight and noticed that if I changed the scheduled date, I got a little multi-colored bar looking thing in agenda week view. Is that the "graph"? > #+begin_src org > ,* TODO note down month's accomplishments/contributions > , SCHEDULED: <2011-07-25 Mon .+5d/10d> > , :LOGBOOK: > , - State "DONE" from "TODO" [2011-07-20 Wed 12:00] > , - State "DONE" from "TODO" [2011-07-15 Fri 12:00] > , :END: > , :PROPERTIES: > , :STYLE: habit > , :LAST_REPEAT: [2011-07-20 Wed 12:00] > , :END: > #+end_src So... is the "graph" the above? Simply a documented history of habits? Or is it something else (perhaps the colored thing in agenda view)? > - Side note: It seems that like when experimenting you have set the > task twice to DONE at the same time which is not useful but does not > hurt to get started with habits. Yeah -- it was an accident. I was just verifying that cycling to "done" didn't really close the task but, indeed, added another state change note and updated LAST_REPEAT. In real use, I wouldn't do this more than per the scheduled habit timeline. Lastly, if that graph *is* the colored bar in agenda, I notice that it's cutting off most of my text. For example, this updated bit: ,----- | ** todo note down month's accomplishments/contributions | SCHEDULED: <2011-07-22 Fri .+25d/35d> `----- Produces this in agenda: ,----- | Wednesday 27 July 2011 | eval: todo note down month's acc ! :eval:: | Thursday 28 July 2011 `----- The space between "acc" and the "!" is filled with blue, then green, then a yellow, and then a red square(s). Can one change this appearance and how early the graph starts? If that's the "graph," then I guess I just didn't understand how the display in agenda worked and was mistaken in expecting future events to show up as I scrolled through the year's view. I think that's fine. Just wanted to make sure I wasn't messing something up. The manual still gives the impression that the "graph" will show the history of my habits, whereas this thing in agenda is only showing whether I'm ahead, on schedule, or late for this *current* habit. Thanks for any input, John > > On Tue, Jul 26, 2011 at 23:22, John Hendy <jw.hendy@gmail.com> wrote: >> I'm attempting to implement habits for a couple of routine things I >> should do at work on a regular basis. I've been following the manual >> to set this up: >> >> ,----- >> | 1. You have enabled the habits module by customizing the variable >> org-modules. CHECK >> | 2. The habit is a TODO item, with a TODO keyword representing an >> open state. CHECK >> | 3. The property STYLE is set to the value habit. CHECK >> | 4. The TODO has a scheduled date, usually with a .+ style repeat >> interval... CHECK >> | 5. The TODO may also have minimum and maximum ranges specified by >> using the syntax ‘.+2d/3d’... CHECK >> | 6. You must also have state logging for the DONE state enabled... THINK SO >> `----- >> >> I have mid-year and yearly reviews and *always* kick myself for not >> recording things I've done regularly, such that I end up scouring the >> earth for details about what I did in emails, calendar items, and org >> files. I'd like to do this monthly to save me 2x/year headaches. So... >> enter my first attempt at implementing habits: >> >> ----- >> ** todo note down month's accomplishments/contributions >> SCHEDULED: <2011-08-20 Sat .+25d/35d> >> :LOGBOOK: >> - State "done" from "todo" [2011-07-26 Tue 16:02] >> - State "done" from "todo" [2011-07-26 Tue 16:02] >> :END: >> :PROPERTIES: >> :STYLE: habit >> :LAST_REPEAT: [2011-07-26 Tue 16:02] >> :END: >> ----- >> >> Note that above for #6, I said I thought so. I'm saying that as the >> todo -> done state appears to be tracked above in my cycling. >> Typically, I just get a completed inactive time stamp and it gets >> marked done. The fact that it stays open I'm guessing means the habit >> is working. >> >> But... I have a couple of questions: >> >> #1: the habits aren't showing up in agenda. I did =C-c a a=, then =v >> y= and accepted that I really wanted to see the year. I get no monthly >> views of the above habit, despite seeing the minibuffer mode as >> "Org-agenda Year Dds Grid Habit" If I press =K=, it tells me that >> habits have been turned off, so I know they were on. >> >> #2: I just don't understand this at all (from the manual): >> >> ,----- >> | What's really useful about habits is that they are displayed along >> with a consistency graph, >> | to show how consistent you've been at getting that task done in the >> past. This graph shows >> | every day that the task was done over the past three weeks, with >> colors for each day. >> | >> | Followed by overview of what the colors mean... >> `----- >> >> Where is this graph? I don't see any colors. The worg tutorial doesn't >> mention the word graph anywhere, and only shows making a table >> manually to document progress. It also doesn't mention the word color. >> >> Thanks for any suggestions. It's my first time, so it's probably that >> I've missed something silly in my setup or have a typo. >> >> >> Thanks! >> John > ^ permalink raw reply [flat|nested] 6+ messages in thread
* Re: Habits not showing in agenda and no progress graph 2011-07-27 6:16 ` John Hendy @ 2011-07-27 7:23 ` Michael Brand 2011-07-27 14:26 ` Memnon Anon 1 sibling, 0 replies; 6+ messages in thread From: Michael Brand @ 2011-07-27 7:23 UTC (permalink / raw) To: John Hendy; +Cc: emacs-orgmode Hi John On Wed, Jul 27, 2011 at 08:16, John Hendy <jw.hendy@gmail.com> wrote: > I was playing around a bit tonight and > noticed that if I changed the scheduled date, I got a little > multi-colored bar looking thing in agenda week view. Is that the > "graph"? yes, see also the PNG link in the first post of John Wiegley, the author of org-habit.el, in this thread http://thread.gmane.org/gmane.emacs.orgmode/43492 >> #+begin_src org >> ,* TODO note down month's accomplishments/contributions >> , SCHEDULED: <2011-07-25 Mon .+5d/10d> >> , :LOGBOOK: >> , - State "DONE" from "TODO" [2011-07-20 Wed 12:00] >> , - State "DONE" from "TODO" [2011-07-15 Fri 12:00] >> , :END: >> , :PROPERTIES: >> , :STYLE: habit >> , :LAST_REPEAT: [2011-07-20 Wed 12:00] >> , :END: >> #+end_src > > So... is the "graph" the above? Simply a documented history of habits? no > Or is it something else (perhaps the colored thing in agenda view)? yes, the the colored thing in agenda view > Lastly, if that graph *is* the colored bar in agenda, I notice that > it's cutting off most of my text. For example, this updated bit: > [...] > The space between "acc" and the "!" is filled with blue, then green, > then a yellow, and then a red square(s). Can one change this > appearance and how early the graph starts? I would look in "C-h org-habit TAB" done in an agenda view and maybe also org-habit.el. (I did not change habit the config yet but someday/maybe I would like to add somehow in org-habit.el a sort order within habits of alternatively "remaining days"; now it's "some ratio of last and remaining days".) > If that's the "graph," then I guess I just didn't understand how the > display in agenda worked and was mistaken in expecting future events > to show up as I scrolled through the year's view. I think that's fine. > Just wanted to make sure I wasn't messing something up. > > The manual still gives the impression that the "graph" will show the > history of my habits, whereas this thing in agenda is only showing > whether I'm ahead, on schedule, or late for this *current* habit. maybe "C-h org-habit-show-habits-only-for-today" works for you? > Thanks for any input http://thread.gmane.org/gmane.emacs.orgmode/35628 http://orgmode.org/worg/org-tutorials/tracking-habits.html Michael ^ permalink raw reply [flat|nested] 6+ messages in thread
* Re: Habits not showing in agenda and no progress graph 2011-07-27 6:16 ` John Hendy 2011-07-27 7:23 ` Michael Brand @ 2011-07-27 14:26 ` Memnon Anon 2011-07-28 4:18 ` John Hendy 1 sibling, 1 reply; 6+ messages in thread From: Memnon Anon @ 2011-07-27 14:26 UTC (permalink / raw) To: emacs-orgmode John Hendy <jw.hendy@gmail.com> writes: > Ah. That might have done it. I was playing around a bit tonight and > noticed that if I changed the scheduled date, I got a little > multi-colored bar looking thing in agenda week view. Is that the > "graph"? Yes. >> #+begin_src org >> ,* TODO note down month's accomplishments/contributions >> , SCHEDULED: <2011-07-25 Mon .+5d/10d> >> , :LOGBOOK: >> , - State "DONE" from "TODO" [2011-07-20 Wed 12:00] >> , - State "DONE" from "TODO" [2011-07-15 Fri 12:00] >> , :END: >> , :PROPERTIES: >> , :STYLE: habit >> , :LAST_REPEAT: [2011-07-20 Wed 12:00] >> , :END: >> #+end_src > > So... is the "graph" the above? Simply a documented history of habits? > Or is it something else (perhaps the colored thing in agenda view)? The colored graph in your agenda view. A setting of org-habit-following-days 7 org-habit-preceding-days 21 org-habit-show-habits-only-for-today t will show that graph, representing the past 3 weeks and the next week ahead in your *daily* Agenda for today. If you have a task like "Water plants" that should be done .+2d/4d, you will see how well you have been keeping up with it: "*" marks DONE, "!" marks today. The background color reminds you of the "range" you set up: Green is great, yellow is okay, red is ... bad ;). > Lastly, if that graph *is* the colored bar in agenda, I notice that > it's cutting off most of my text. For example, this updated bit: Yes, better to keep the headlines short for habits or the graph will cut it off. > The space between "acc" and the "!" is filled with blue, then green, > then a yellow, and then a red square(s). Can one change this > appearance and how early the graph starts? See above. > If that's the "graph," then I guess I just didn't understand how the > display in agenda worked and was mistaken in expecting future events > to show up as I scrolled through the year's view. I think that's fine. > Just wanted to make sure I wasn't messing something up. From what I read, I don't think org-habit is the tool you want. I found they work best for fairly regular tasks; I use them for cleaning tasks like "Do vacuum cleaning .+3d/5d". > The manual still gives the impression that the "graph" will show the > history of my habits, whereas this thing in agenda is only showing > whether I'm ahead, on schedule, or late for this *current* habit. If you are ahead, on schedule, late for this *current* habit now (!) and for the past e.g. three weeks (asterisk). Memnon ^ permalink raw reply [flat|nested] 6+ messages in thread
* Re: Habits not showing in agenda and no progress graph 2011-07-27 14:26 ` Memnon Anon @ 2011-07-28 4:18 ` John Hendy 0 siblings, 0 replies; 6+ messages in thread From: John Hendy @ 2011-07-28 4:18 UTC (permalink / raw) To: Memnon Anon; +Cc: emacs-orgmode Thanks to both you and Michael for persisting with me! On Wed, Jul 27, 2011 at 9:26 AM, Memnon Anon <gegendosenfleisch@googlemail.com> wrote: > John Hendy <jw.hendy@gmail.com> writes: > >> Ah. That might have done it. I was playing around a bit tonight and >> noticed that if I changed the scheduled date, I got a little >> multi-colored bar looking thing in agenda week view. Is that the >> "graph"? > > Yes. Got it. <snip> > A setting of > org-habit-following-days 7 > org-habit-preceding-days 21 > org-habit-show-habits-only-for-today t > will show that graph, representing the past 3 weeks and the next week > ahead in your *daily* Agenda for today. I see the bar, but it's just not intuitive to me. Maybe I don't have enough history, but I see now way that this bar is connected to anything but the current task. That much I get, seeing the history of my habits is not making sense. <snip> >> If that's the "graph," then I guess I just didn't understand how the >> display in agenda worked and was mistaken in expecting future events >> to show up as I scrolled through the year's view. I think that's fine. >> Just wanted to make sure I wasn't messing something up. > > From what I read, I don't think org-habit is the tool you want. > I found they work best for fairly regular tasks; I use them for cleaning > tasks like "Do vacuum cleaning .+3d/5d". Yeah; I don't know that I need the bar. I removed the "style: habit" property and the functionality seems to be identical except that I get no colored bar, and all the future events show up rather than only when they are in the range. That's fine with me. I think I could get the same with org-habit if I want to keep them out of the agenda (thought I bet there's a way to fiddle with displayed recurring events given what org-mode allows anyway). > >> The manual still gives the impression that the "graph" will show the >> history of my habits, whereas this thing in agenda is only showing >> whether I'm ahead, on schedule, or late for this *current* habit. > > If you are ahead, on schedule, late for this *current* habit now (!) > and for the past e.g. three weeks (asterisk). > I think I just must not have history -- I have no asterisk, just green, blue, yellow, red, and !. Thanks again to both of you (just responded to this one as the info was pretty much the same and this one was more recent) John > Memnon > > > ^ permalink raw reply [flat|nested] 6+ messages in thread
end of thread, other threads:[~2011-07-28 4:18 UTC | newest] Thread overview: 6+ messages (download: mbox.gz follow: Atom feed -- links below jump to the message on this page -- 2011-07-26 21:22 Habits not showing in agenda and no progress graph John Hendy 2011-07-27 5:32 ` Michael Brand 2011-07-27 6:16 ` John Hendy 2011-07-27 7:23 ` Michael Brand 2011-07-27 14:26 ` Memnon Anon 2011-07-28 4:18 ` John Hendy
Code repositories for project(s) associated with this public inbox https://git.savannah.gnu.org/cgit/emacs/org-mode.git This is a public inbox, see mirroring instructions for how to clone and mirror all data and code used for this inbox; as well as URLs for read-only IMAP folder(s) and NNTP newsgroup(s).