unofficial mirror of bug-gnu-emacs@gnu.org 
 help / color / mirror / code / Atom feed
* bug#10452: 24.0.92; calendar-abbrev-length in calendar.el
@ 2012-01-08 10:59 Peter Dyballa
  2012-01-08 12:30 ` Andreas Schwab
  0 siblings, 1 reply; 4+ messages in thread
From: Peter Dyballa @ 2012-01-08 10:59 UTC (permalink / raw)
  To: 10452

Hello!

The introduction of this variable is no good idea. In German we are using two values: the number 2 for day names and the number 3 for month names.

--
Greetings

  Pete

To most people solutions mean finding the answers. But to chemists solutions
are things that are still all mixed up.






^ permalink raw reply	[flat|nested] 4+ messages in thread

* bug#10452: 24.0.92; calendar-abbrev-length in calendar.el
  2012-01-08 10:59 bug#10452: 24.0.92; calendar-abbrev-length in calendar.el Peter Dyballa
@ 2012-01-08 12:30 ` Andreas Schwab
  2012-01-08 19:19   ` Glenn Morris
  2012-01-12  5:55   ` Kevin Rodgers
  0 siblings, 2 replies; 4+ messages in thread
From: Andreas Schwab @ 2012-01-08 12:30 UTC (permalink / raw)
  To: Peter Dyballa; +Cc: 10452

Peter Dyballa <Peter_Dyballa@Freenet.DE> writes:

> The introduction of this variable is no good idea. In German we are using two values: the number 2 for day names and the number 3 for month names.

You can set calendar-day-abbrev-array to anything you like.

Andreas.

-- 
Andreas Schwab, schwab@linux-m68k.org
GPG Key fingerprint = 58CA 54C7 6D53 942B 1756  01D3 44D5 214B 8276 4ED5
"And now for something completely different."





^ permalink raw reply	[flat|nested] 4+ messages in thread

* bug#10452: 24.0.92; calendar-abbrev-length in calendar.el
  2012-01-08 12:30 ` Andreas Schwab
@ 2012-01-08 19:19   ` Glenn Morris
  2012-01-12  5:55   ` Kevin Rodgers
  1 sibling, 0 replies; 4+ messages in thread
From: Glenn Morris @ 2012-01-08 19:19 UTC (permalink / raw)
  To: 10452-done

tags 10452 notabug wontfix
severity 10452 wishlist
stop

Andreas Schwab wrote:

> Peter Dyballa <Peter_Dyballa@Freenet.DE> writes:
>
>> The introduction of this variable is no good idea.

It exists since Emacs 22.

> You can set calendar-day-abbrev-array to anything you like.

Indeed. calendar-abbrev-length only provides a default set of
abbreviations. I'm not going to introduce separate length variables for
days and months.





^ permalink raw reply	[flat|nested] 4+ messages in thread

* bug#10452: 24.0.92; calendar-abbrev-length in calendar.el
  2012-01-08 12:30 ` Andreas Schwab
  2012-01-08 19:19   ` Glenn Morris
@ 2012-01-12  5:55   ` Kevin Rodgers
  1 sibling, 0 replies; 4+ messages in thread
From: Kevin Rodgers @ 2012-01-12  5:55 UTC (permalink / raw)
  To: 10452

On 1/8/12 5:30 AM, Andreas Schwab wrote:
> Peter Dyballa<Peter_Dyballa@Freenet.DE>  writes:
>
>> The introduction of this variable is no good idea. In German we are using two values: the number 2 for day names and the number 3 for month names.
>
> You can set calendar-day-abbrev-array to anything you like.

Here's some code I posted in 2006 to automatically set localized day and month 
names.  To set localized abbrevs, just use the lowercase "%a" and "%b" formats
instead.

(let ((days (locale-info 'days))
       (months (locale-info 'months)))
   (if days
       (setq calendar-day-name-array days)
     (let ((this-year
            (string-to-number (format-time-string "%Y")))
           (this-month
            (string-to-number (format-time-string "%m"))))
       (setq calendar-day-name-array
             (apply 'vector
                    (mapcar (lambda (time)
                              (format-time-string "%A" time))
                            (sort (mapcar (lambda (day)
                                            (encode-time 0 0 0 day
                                                         this-month this-year
                                                         0))
                                          '(1 2 3 4 5 6 7))
                                  ;; by day of week:
                                  (lambda (time-1 time-2)
                                    (< (nth 6 (decode-time time-1))
                                       (nth 6 (decode-time time-2))))))))))
   (if months
       (setq calendar-month-name-array months)
     (let ((this-year
            (string-to-number (format-time-string "%Y"))))
       (setq calendar-month-name-array
             (apply 'vector
                    (mapcar (lambda (month)
                              (let ((first (encode-time 0 0 0 1 month
                                                        this-year
                                                        0)))
                                (format-time-string "%B" first t)))
                            '(1 2 3 4 5 6 7 8 9 10 11 12)))))))


-- 
Kevin Rodgers
Denver, Colorado, USA






^ permalink raw reply	[flat|nested] 4+ messages in thread

end of thread, other threads:[~2012-01-12  5:55 UTC | newest]

Thread overview: 4+ messages (download: mbox.gz follow: Atom feed
-- links below jump to the message on this page --
2012-01-08 10:59 bug#10452: 24.0.92; calendar-abbrev-length in calendar.el Peter Dyballa
2012-01-08 12:30 ` Andreas Schwab
2012-01-08 19:19   ` Glenn Morris
2012-01-12  5:55   ` Kevin Rodgers

Code repositories for project(s) associated with this public inbox

	https://git.savannah.gnu.org/cgit/emacs.git

This is a public inbox, see mirroring instructions
for how to clone and mirror all data and code used for this inbox;
as well as URLs for read-only IMAP folder(s) and NNTP newsgroup(s).